An act relating to plug-in photovoltaic devices

Current status Enacted
Primary source Checked28 Aug 2026
Bill / statute
S.202; Act No. 149 (2026)
Signed
16 Jun 2026
Effective
1 Jul 2026
Max output per the bill
1,200 W
Checked 28 Aug 2026
Status reflects the text of the bill or statute linked in each row as published by the state legislature, checked on 28 Aug 2026. We summarize what the text says; we do not assess whether a system may be used in your home. Laws change and utilities apply their own rules. Read the linked source and check with your utility before buying or connecting anything.
Certification the bill requires
'Complies with UL 3700 for plug-in photovoltaic systems by UL Solutions or an equivalent certification by an equivalent Nationally Recognized Testing Laboratory'; installed and operated in compliance with IEEE 1547-2018.
Notification
None to the utility in the act text. The utility shall not require approval before installation or use, or fees; exempt from 30 V.S.A. ยง248 and interconnection agreements. Tenants must give the landlord 10 days' notice.